Hey Guys,
I need to migrate my server application and database from HP Proliant ML 350 G6 to HP Proliant ML 350 Gen 9 safely without corrupting my drives and losing data. This essentially means that I would be migrating data from a system using P-420i controller to one using P-440ar controller.
How is it possible to do this successfully considering the data needs to migrate from one set of SAS drives (in the older server) to another (in the newer server) and each has a different version of controller.
Your assistance will be highly appreciated
Regards
Q